END TO END ASSET MODELLING. DATA TO DECISIONS.

Learn More

ASSET ANALYTICS. ON-TAP.

Our services

RELIABILITY ENGINEERING. EMBEDDED IN ASSET MODELS.

Get in touch

KNOWLEDGE CAPTURE. AUTOMATED DEPLOYMENT.

Stay updated
October 1, 2019
Author:
Dane Boers

Using control system trends for RCA Timelines.

Reliability Engineering tip of the week: As a former control systems engineer, historian (e.g. PI) data is a great first place to look when conducting RCA’s or Investigations. Use trends and log files to help establish an evidence-based timeline or sequence of events.There are too many times when I’ve had an operator say that “We didn’t push the stop button”, when the control log says the stop command was initiated from their workstations!

Failure Trends

Privacy Policy

Stay Updated